Pete Eager Fire Hall

The Challenge

Improve the reliability and reduce maintenance burdens of the existing standby generator system to accommodate a new building expansion. Minimize downtown and impact on daily fire hall operations.

The Solution

Design and specify a new standby emergency generator and integrate it into the existing building distribution system. Conduct multiple site investigations to ensure design accuracy and right-the-first-time solutions.

Location

Grande Prairie, AB

Photo by City of Grande Prairie

Photo by City of Grande Prairie