Municipal

Aqua-Fit Centre

The Challenge

The Aqua-Fit Centre's pool and change room lighting was dim, dark, and uneven. The community rec centre needed an economical fix to ensure safe and effective light levels throughout the facility.

The Solution

A full replacement of existing lighting, including LED high-bay fixtures throughout the pool area. Wave designed a plan to minimize construction costs and meet the pool's scheduled facility shut down.

Location

Beaumont, AB

Teepee Creek School

The Challenge

Update the lighting and install new fire alarm systems in new locations throughout the Teepee Creek school. Work extended through the gym, library, kitchen, and classroom areas. 

The Solution

Well-planned designs with field investigations to verify existing conditions. And to keep the kids in class, system commissioning and fire alarm verification was performed outside of school hours.

Location

Sexsmith, AB

Credit: PWSD No.76

Credit: PWSD No.76

Leduc Downtown Vitalization

The Challenge

Revitalize a downtown core and main street. Provide a forward-looking design that also aligns with the character and history of the existing businesses. 

The Solution

A full streetscape improvement including new roadway lighting, way-finding signs and features, decorative tree and feature lighting, and power for seasonal events. Includes full stakeholder engagement and community consultation.

Location

Leduc, AB

Credit: MMM Group Ltd

Credit: MMM Group Ltd

Lakeshore Drive Redevelopment

The Challenge

Refresh and reinvigorate twelve blocks of lakefront promenade in one of Alberta's most popular beach towns. 

The Solution

Full streetscape improvements, including decorative and feature lighting, new roadway lighting, and power for seasonal events. Includes electrical engineering services from planning and stakeholder engagement to detailed design and support during construction.

Location

Sylvan Lake, AB

Credit: EIDOS Consultants

Credit: EIDOS Consultants

Wembley Sports Field

The Challenge

A community focal point needed a cost-effective way to light their field for year round enjoyment. Football games shouldn't need to end when the sun sets.

The Solution

Professional-grade football field lighting and an electronic score board are added to the local field. Lighting levels designed to Class III level of play. Electrical engineering services included community consultation and area lighting analysis & analysis.

Location

Wembley, AB

Simulation by Wave Engineering Consultants

Simulation by Wave Engineering Consultants